Damietta Port - Egypt
Client
Ministry of Transport
Status
Start in 2025 and still on going
Scope Of Work
Damietta Port Authority intends for dredging & reclamations works for new basin, with approx. dredging quantity )16 ~ 20) million m3 for its port development up to (-17.00 CD) meters under sea water level. And benefit from the reclamation nearby areas with total filling quantity Approx. (14) million m3 for its port development up to Approx. (3.00) meters above sea water level. Then get the reclamation area ready for construction later on by improve the soil property.
Theme
Damietta / Al-Daqahliyah / Port Said – Egypt
Client
The General Authority for Fish Resources Development
Status
Completed, 2021 – 2025
Scope Of Work
The project includes the deepening and filling about 17 million m3 of materials using CSD dredgers which deepen the lake and raising the water level up to about – 3.00 meters CD , thus maintaining the water level through the year as well as preserving the water coming from the drain inside the lake, in addition to the benthic sediment removal and disinfection works.
Theme
Lake King Marriot – Alexandria - Egypt
Client
Suez Canal Authority - SCA
Status
Completed, 2021 – 2023
Scope Of Work
The project includes the deepening and filling about 8 million m3 of materials using CSD dredgers which deepen the lake and raising the water level from 30 centimeters to about 3 meters, thus maintaining the water level through the year as well as preserving the water coming from the drain inside the lake to meet development requirements.
Theme
Ain Sokhna Port Project Dredging - Egypt
Client
SCZONE - Ministry of Transport
Status
Ongoing , 2023 - 2026
Scope Of Work
Dredging Basins 3,5,6 up to level -18.00 with Approx. 19.1 million m3 in very stiff and hard materials consist of calcareous and cemented layers using the powerful Dredgers manufactured specially for this kind of hard materials.
Theme
Sokhna port construction - Egypt
Client
SCZONE - Ministry of Transport
Status
Completed, 2022 - 2024
Scope Of Work
The project is construction of marine wall of 35 meter depth 1,250 m length with 36x2.5m deck consist of diaphragm wall of 1.20 m width, 668 vertical elements piles of 45 m depth, 334 barrettes of 0.80 m x 2.80 & 35m depth and deck crane railway With a capacity of 60 tons.